Project Overview:
The 30-inch Sui gas transmission pipeline was designed and implemented to connect the Sui gas refinery to Pakistan’s national transmission network.
With a total length of 10 kilometers, this pipeline plays a critical role in enhancing transmission capacity and ensuring stable gas distribution in the region.
Execution Activities:
– Route surveying and trench excavation
– Pipe transportation and stringing
– Pipe bending and welding
– Radiographic inspection and coating
– Pipeline laying and backfilling
– Obstacle crossing and station facility construction
– Installation of cathodic protection, testing, and commissioning
Key Feature:
– Connection of the Sui Gas Refinery to the national transmission network using the UPLIFTING method